Managing the Curb: Understanding the Impacts of On-Demand Mobility on Public Transit, Micromobility, and Pedestrians

In recent years, innovative mobility and shifts in travel and consumption behavior are changing how people access and use the curb. Shared mobility—the shared use of a vehicle, bicycle, scooter, or other mode—coupled with outdoor dining, curbside pick-up, and robotic delivery are creating new needs related to the planning, management, and enforcement of curb access. This study examines curb planning and management from several angles, such as safety, social equity, and multimodal connections. This research employs a multi-method approach to identify the changing needs for curb space management and how to meet these needs through new planning and implementation policies and strategies. As part of this study, the authors conducted 23 interviews. Respondents were chosen to represent public, private, and non-profit sector perspectives. Additionally, the authors employed a survey of 1,033 curb users and 241 taxi, transportation network company (TNC), and public transportation drivers. The study finds that changes in mode choice and curbside use can result in a variety of impacts on access, social equity, congestion, device management, pick-up and drop-off, and goods delivery, to name a few. The curb also has the potential to be disrupted by emerging modes, such as robotic delivery vehicles (also known as personal delivery devices) and automated vehicles. As these emerging developments continue to impact the curb, it is becoming increasingly important for policymakers to have an appropriate framework for planning and managing curb space in urban areas.

University: 
Mineta Consortium for Transportation Mobility
San José State University
Principal Investigator: 
Susan Shaheen, PhD
PI Contact Information: 

Mineta Transportation Institute
San José State University
210 N. 4th St., 4th Floor
San José, CA 95112
sashaheen@tsrc.berkeley.edu 

Funding Source(s) and Amounts Provided (by each agency or organization): 

California Department of Transportation -- $110,983 

Total Project Cost: 
$110,983
Dates: 
April 2019 to December 2020
Project Number: 
1904

-

CSUTC
MCEEST
MCTM
NTFC
NTSC

Contact Us

SJSU Research Foundation   210 N. 4th Street, 4th Floor, San Jose, CA 95112    Phone: 408-924-7560   Email: mineta-institute@sjsu.edu